Ostrava → Bratislava
Bratislava → Ostrava ⇄1 a dayfastest 3h24PKP IntercityIntercity
Direct trains · no change
- 13:43 → 17:07IC 131 IntercityOstrava hlavní nádraží → Bratislava hlavná stanica · via Přerov, Břeclav3h248 stopsRuns: DailyPKP Intercity ↗
Local times at each station. Times from official open data: PKP PLK (file of 12 Nov 2026) and ŽSR (file of 13 May 2026). Checked Thu 12 Nov 2026; they cover 12 Nov to 9 Dec 2026. Timetables change, so check with the operator before you travel. How we build this.